hectorcal1143 hectorcal1143
  • 04-09-2019
  • Computers and Technology
contestada

_________ is the biggest problem you can face if you don’t identify the scope of your risk management project. Scope creep Noncompliance System failure Nonrepudiation

Respuesta :

Numenius
Numenius Numenius
  • 12-09-2019

Answer: Scope creep

Explanation:

 Scope creep in the project management basically refers to the uncontrolled development or growth in the project creep. It basically occur when the project scope are not appropriately defined.

It usually involve lack of change in the control system and increase the complexity of the project. It is also has poor requirement analysis.

So, that is why it is the biggest problem we usually face in the project management.

Answer Link

Otras preguntas

what are natural number less than 5​
Consider the equation below. (If an answer does not exist, enter DNE.) f(x) = e8x + e−x (a) Find the interval on which f is increasing. (Enter your answer using
Who is Hinduism founder
Which one of the following foods is not a good choice for a traveling athlete's emergency food kit? A. Beef j***y (censored because they didn't allow me to type
A rocket moves upward from rest with an acceleration of 40 m/s2 for 5 seconds. It then runs out of fuel and continues to move upward. Neglecting any air resista
The equation of a line is -6x - 2y = -18. What is the x-intercept & y-intercept of the line?
Simplify the expression. --15xy-8 3x-3y4 Write your answer without negative exponents. How
What was the Reign of Terror
Yo ____ la leccion. Fill in the blank with the best verb
Apathy is one reason experts think that many people do not bother to vote true or false