​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

Given: F(x) = 3x and G(x) = x 2 + 1 Find (F + G)(x).  3x³ + 1 x² + 3x + 1 3x² + 1
The center of a regular polygon is the center of the circle circumscribed inscribed included Click on the correct answer.
Monica is required to develop an assignment using critical writing rather than personal writing. It will be important for her to understand that the main differ
I need the solution and the work for it... for each of the multiple choices.
How do you factor 7x^2 - 3x
I was absent in class today. Can somebody please explain how to diagram a sentence? Maybe an example too?
Quadrilateral BIRD is inscribed in circle O. What is the measure of angle D?
Identify the question that people should ask themselves when previewing both images and texts. A.What is my first response to this​ work? B.What clues do I see
Which of the following routes of blood flow is correct? Heart → venule → medium vein → large vein → capillary → conducting artery → distributing artery → arteri
What is the value of k?