Sadeghshakeri97 Sadeghshakeri97
  • 02-12-2019
  • Mathematics
contestada

60% of the work is done in 17 minutes, 40% of the same work, when is done (in minutes)?

Respuesta :

bridgecostello bridgecostello
  • 02-12-2019

Answer:

It would be 11.333 minutes

Step-by-step explanation:

I solved this by setting up a cross multiplication.

60%/17 so then 40/x.

Then here cross multiplying. 60x=680. divide by 60 and x would = 11.33

Answer Link

Otras preguntas

in what for do plants utilize nitrogen? why do they need nitrogen?
What is r i 4.5+10r=-6.5 with work pls
why was russia drawn into a conflict with germany after ausria-hungary declared war on serbia ?
What is the definition of mass?
the word enamored means
Individuals undergoing hypnosis ________.
What must you do before formatting a paragraph?
What is 100,000 times 1/100,000, using the standard method of multiplication? Write the answer as 10 to a power.
jason went to an arcade to play video games. he paid $2 for every 11 tokens he bought. he spent a total of $16 on tokens. which equation can be used to determin
what causes earth 's plate to move