alishertlv alishertlv
  • 14-05-2020
  • Mathematics
contestada

Four workers finish some work in 90 minutes. How much time it will take six workers to finish same work

Respuesta :

Wishing Wishing
  • 14-05-2020

Answer:

135 minutes.

Step-by-step explanation:

Let's use a ratio:

workers : minutes

     4       :      90

     1        :     22.5

     6       :      135

It will take them 135 minutes (it seems wrong but...)

Answer Link

Otras preguntas

find a common solution for each system of equations: y=3x+5 y=-5x-3
List all the commonwealth games mascots from 1982-2014
David helped his father stock the pond with baby catfish and blue gill. They put in a total of 75 fish. If the number of blue gill was doubled and the number of
Find the length of the radius of the following circle. (x + 2)2 + y2 = 10
Multiply these fractions (Lowest Terms) a) 2 x 3/4 b) 3 x 3/5 c) 4 x 1/3 d) 6 x 2/5 e) 1/2 x 1/4 f) 4/5 x 2/3 g) 5/6 x 3/4 h ) 1/10 x 2/3 i) 2 1/5 x 1/
how can bureaucratic personality be dangerous
Find 4 consecutive odd integers where the product of the two smaller numbers is 64 less than the product of the two larger numbers.
find a common solution for each system of equations: y=3x+5 y=-5x-3
Which expression can be used to change 75 kilometers per hour to meters per minute?
how do u find the area of a triangle