A can do a piece of work in 20 days and B can do it in 12 days,B work for 9 days,in how many days A alone can do the work​

Respuesta :

roseheart889 roseheart889
  • 03-09-2020

Answer: 9

Step-by-step explanation:

Answer Link

Otras preguntas

The box plots show the weights, in pounds, of the dogs in two different animal shelters. Weights of Dogs in Shelter A 2 box plots. The number line goes from 6 t
A shop is opened at 7.45 am and closed at 6.30 pm on each day from Monday to Friday. Calculate the total time the shop is opened from Monday to Friday.​
Which of the following segments is tangent to the circle? 1 overline HI 2 ) overline DE 3) overline FG 4 ) overline AC
how does the exchange of oxygen and carbon dioxide gases take place in the human body describe in short​
An elephant went 119 km moving 42 km/h how many hours did the journey take? 2 1/6 2 1/2 2 5/6
Write the number five and a quarter million in figures.
Tickets for a basketball game cost $5 for students and $8 for adults. The number of students was 7 less than 9 times the number of adults. The total amount of m
which equation matches this graph?​
Match each ghost with what help Elbe ever scrooge realize in Charles ducks a crismas carol
definition of radical ​