melanyperez890 melanyperez890
  • 02-11-2020
  • Mathematics
contestada

How much does programmer charge for a coding project that takes 6 hours?
A computer charges $45 an hour for coding projects plus start-up fee of $150

Respuesta :

25tristanme
25tristanme 25tristanme
  • 02-11-2020

Answer:

150 + 45h

Explanation:

Hope this helps.

Answer Link

Otras preguntas

Round 1,129 to 2 decimal places.
A 25-newton weight falls freely from rest from the roof of a building. What is the total distance the weight falls in the first 1.0 second? (1) 19.6 m (3) 4.9 m
Which of the following will result in a chemical change? A. Melting ice to obtain water B. Drying wood in a shed C. Burning coal in a furnace D. Evaporating al
Foreign speakers learning English often use dangling modifiers. a. True b. False
What was the Atlantic Charter? A. an agreement made at the Yalta Conference between Roosevelt, Churchill and Stalin to divide up Germany after the war B. an ag
Write a Paragraph about cooking, knitting and reading books as hobbies
Experiments revealed the following information about a certain molecule: It can be broken down into amino acids. It can break down proteins into amino acids. It
The disputed ownership of the Kuril Islands kept Japanese relations tense with what nation? a. The U.S. c. Philippines b. The Soviet Union d. Great Britain
Which statement best describes the shape and volume of an aluminum cylinder at STP? (1) It has a definite shape and a definite volume. (2) It has a definite sha
A 750-newton person stands in an elevator that is accelerating downward. The upward force of the elevator floor on the person must be (1) equal to 0 N (3) equal