When looking at a program board at the end of program increment (PI) planning, what does it mean when a feature is placed in a team's swim lane with no strings

Respuesta :

IfeanyiEze8899 IfeanyiEze8899
  • 04-01-2021

Answer:

It simply means that other teams can independently complete the feature.

Explanation:

PI or program increment is a planning interval during which an agile release train (ART) plans and produces working and tested software and systems. It takes a duration of 8 to 12 weeks

Agile teams can access and independently complete various ARTs found in their swim lanes with no strings.

Answer Link

Otras preguntas

Quadrilateral ABCD is an isosceles trapezoid. If AB || CD, AB = m + 6, CD = 3m + 2, BC = 3m, and AD = 7m - 16, solve for m. A.) 2 B.) 3 C.) 4 D.) 5
Which word correctly completes this sentence? La _________ del mar refresca la costa.
Just say answer, no need to explain. Thanks
some refer to nuclear as clean energy why do they make this argument
what is a scientific explanation that is widely accepted and based on a vast amount of evidence?
The problem is in the picture
Just say answer, no need to explain. Thanks
Hydrogen fuel cells combine hydrogen and oxygen to produce water and energy. Assume 1 kg of fuel is used, and the mass of the water produced is 1.10 x 10-11 kg.
Which of the following is associated with Qin San Shi?
Need help please !!!!!