skowndoensm
skowndoensm skowndoensm
  • 02-01-2021
  • Computers and Technology
contestada

Select the correct answer.
What helps the project team to identify the latest software build?
A.
defect
B.
version number
C.
test plan
D.
test environment
E.
hardware

Respuesta :

ianhulett
ianhulett ianhulett
  • 05-01-2021

Answer:

B version number

Explanation:

Answer Link

Otras preguntas

A packet is dropped from a stationary helicopter, hovering at a height 'h' from the ground level, reaches the ground in 12s. Calculate 1) value of 'h' "displac
written in simplest form, the expression (x^2)(y^2)-9 over 3-xy is equivalent to 1. -1 2. 1 over 3+xy 3. -(3+xy) 4. 3+xy Please show work
how many valenceelectrons does rare earth metals have
briefly describe the five stages of the cell cycle
If you know two points on a line, how can you find the rate of change of the variables being graphed?
On a summer afternoon, the sand on the beach can get very hot. When you step on the sand in bare feet, you can burn yourself. Which of the following sentences b
How do I write 4.76325 as a fraction?
when you flick a coin so that it slides across a table, it slows down. what is the name of the force that slows it down
what is the main functions of lipids?
why are quebec and ontario known as canadas economic heart