it takes 8 labours 6days to complete a certain job.how many labours would complete the job in 15 days.​

Respuesta :

lakminirsenarath lakminirsenarath
  • 30-07-2021

Answer:

Step-by-step explanation:

Required man days to complete the job = 8 * 6

                                                                   = 48 Man Days

Required labors to complete the job by 15 days = 48/15

                                                                               = 3.2

It means, it is required 4 labors can complete the certain work by 15 days

Answer Link

Otras preguntas

(8h-1)-(h+3) in standard form
Ethnocentrism in research refers to _____.
In two separate drawers, there are 12 pairs of socks, 9 of which are white, and 7 t-shirts, 5 of which are white. If you randomly select one pair of socks from
a system of two carts has a total initial momentum of 2kg m/s before a collision how much total momentum would the system of two carts have after the collision
solve the following: given 2pie
evaluate and simplify 2/3a - 1/8b + 1/6a​
Describe the connection between the muscular system, nervous system, cardiac system, digestive system and endocrine system when the goat eats and how does the g
Points A, B, and C are collinear with coordinates A(-2,5), B(1,3), and C (x,-13). What is x?
Tarleton State University-Central Texas was established when? a. 1999 b. 2005 c. 2010 d. 2015
By selling a camera for $2400,Ron loses 4%,At what might he sell it to gain 12%?​