maaf34nb8f maaf34nb8f
  • 01-04-2021
  • Engineering
contestada

A short framing member that fills the space
between the rough sill and the soleplate is a

Respuesta :

iBear25k
iBear25k iBear25k
  • 01-04-2021

A short framing member that fills the space between the rough sill and the soleplate is a cripple stud.

(HAVE A GOOD DAY!!!)

Answer Link

Otras preguntas

What is the vertex of f(x) = | 8x + 8| - 3?
Suppose f(x)—>300 and g(x)—>0 with g(x)< 0 as x —>5. Determine lim x—>5 f(x)/g(x)
What is the meaning of the prefix com-? -with or together -over or above -to or toward -before
In a nonpolar covalent bond, protons are shared equally by two atoms. electrons are shared equally by two atoms. electrons are shared unequally by two atoms. pr
Ethnic conflict is common in Sub-Saharan Africa because: _____. colonizers created homogeneous regions colonizers established political borders without consider
Can the polynomial in the numerator of the expression x2-5x+7/x-9 be factored to derive (x − 9) as a factor?
Approximate the value of V110 to the nearest hundredth. HURRRYYYY PLZZZZZ NOWWWW​
Does wi-fi work with all connections
How does the structure of a neuron make it effective in carrying out the functions of the nervous system?
The tendency or inclination to sin is called _______ . justification bad habits concupiscence hardship