ltztellexx
ltztellexx ltztellexx
  • 04-08-2021
  • Physics
contestada

A force of 100 N stretches a spring by 5cm. Calculate the work done.

Respuesta :

Аноним Аноним
  • 04-08-2021

Answer:

Work done is 5 J

Explanation:

Workdone = Force × distance

[tex]{ \sf{W = 100 \times (5 \times {10}^{ - 2}) }} \\ { \sf{W = 5 \: joules}}[/tex]

Answer Link

Otras preguntas

Zoey made 6 3/4 cups of fruit salad for a picnic. At the picnic, they ate 1/3 of the fruit salad. How much fruit salad did they eat?
What area of the long bone is covered with cartilage
A rocket is launched from the ground. The function  h(t)= -4.9t^2 +180t   models the height of a rocket launcher from the ground t seconds after it is launched.
solve for m (r=3m+3z) solution is m=___, use integers or fractions for any numbers in the expression (simplify answer) please help
What is the interquartile range of the data set below? Growth in feet of oak trees: 68,80,73,90,120,94,76,112,101,94,72(1) 22                (2) 28
A climber is on a hike.after 2 hours he is at an altitude of 400 feet. After 6 hours, he is at an altitude of 700 feet. What is the average rate of change?
In a titration, 45.0 mL of KOH is neutralized by 75.0 mL of 0.30M HBr. How much KOH is in 1.0 liter of the KOH solution ?
write the equation in function form then graph it 5x-2y=6 thx to the ppl who help
How do tussock moths obtain energy in cellular respiration?
if square root of 405 rounded to the nearest thousandth is 20.125  how do u simplify to get to that answer, thank u.