JustTrying2Help JustTrying2Help
  • 01-09-2021
  • Computers and Technology
contestada

Which option in a Task element within Outlook indicates that the task is scheduled and will be completed on a later date?

Waiting on someone else
In Progress
Not started
Deferred

Respuesta :

luishernandez748 luishernandez748
  • 01-09-2021

Answer:

in progress

Explanation:

it is being answered by the person

Answer Link

Otras preguntas

Es necesario que____ informacion. A. pides B. pido C. pidamos D. pedir
what is the cause of deforestation
Have an assignment about how many atoms are in a roll of reynold heavy duty aluminum foil. I am not sure how to start?!
Kara creates the table shown to represent the function ƒ(x) = x2 + 2x - 3. Determine the zero(s) of the function.
The _______ in lending act protects consumers against inaccurate and unfair practices from credit card companies and lenders.
Thde ratio of cookies to glasses of milk is 3:1. if there are 25 glasses if milk how many cookies are there
Tara studies for 25 minutes each day. Which equation shows the relationship between the number of days Tara studies, d, and the total amount of time she studies
Which of these statements expresses the most positive connotation? A) Mr. Langley asked the boys to take their seats. B) Mr. Langley begged the boys to take th
Jake is graphing data about the elevation at different points along a hiking trail and the outside temperature at those points. Which type of correlation would
Which is a synonym for genetic engineering? DNA fingerprinting recombinant DNA technology biotechnology restriction enzyme technology