what is changing risk​

Respuesta :

pompomsquad33 pompomsquad33
  • 02-03-2022

Answer:

here:

Explanation:

A change risk is the probability that a change program will not reach its stated objectives and goals. There is a wide range of factors that will increase the change risk for a project, and so it is important to conduct an effective risk change assessment to understand, document, and reduce these change risks.

Answer Link

Otras preguntas

An open rectangular tank is made so as to contain 4.5 metres cube of liquid. The length must be twice the breadth and the amount of material used to make the ta
A patient comes in showing signs of severe depression. Dr. Jorgenson wants to order an EEG and hormone panel, while Dr. Frieden wants to set up a system of rew
What happened when Moctezuma offered Cortés gold to get him to leave?
Why must odysseus go to the land of the dead and what does his willingness to do this show about his character?
What imaginary line separates the northern and Southern Hemisphere
Breaking carbohydrates into their subunits will yield_____ as products. Breaking down proteins will yield_____ as products.
A bundle contains 500 $20 bills. What is the value of 44 bundles?
A molecule with polar and nonpolar parts that only partially dissolves in water is described as __________.
What's the sum of all the integers between √3 and √89 ?
does united states law protect a green card holder who is the victim of a violent crime?