Information to develop a project network is collected from the A. Organization breakdown structure B. Work breakdown structure C. Budget D. Project proposal E. Responsibility matrix

Respuesta :

jlcoglin25
jlcoglin25 jlcoglin25
  • 04-03-2022

Answer: The Answer is B) Work breakdown structure

Explanation:

Answer Link

Otras preguntas

PLZ HELP ASAP What is the range of the cluster in the scatter plot A. between 4 and 8 y
A belief that one's culture is superior to another.
Name three new weapons that changed how WW! was fought and how?
What is n-6=26-8 equal to?
(03.02 HC)Describe a day when you are sick using 4–6 complete French sentences such as: I have a fever and a headache. I go to the doctor, etc. Make sure you us
Find the dimensions of the circle. Area = 64π in.² r= in.
someone please help!
what is 0.368,0.380,0.365,and 0.383 in order from least to greatest
Alice is paying her bill at a Restaurant. But tax on the cost of a male is 5%. She decides to leave a tip 20% of the cost of the meal plus the tax
Line u passes through points (-52, -18) and (-29, 53). Line v passes through points (90, 33) and (19, 56). Are line u and line v parallel or perpendicular?