corinthianshanyqua10 corinthianshanyqua10
  • 13-05-2022
  • Mathematics
contestada

A construction firm is building a football stadium. The building work has taken 499 days so far. It should take another 199 days to build. How many days will the building work take in total

Respuesta :

thompmk
thompmk thompmk
  • 13-05-2022

499

199

+-------  the answer is 698 you have to add 499 and 199.

Answer Link

Otras preguntas

Suppose Sam's Shoe Co. makes only one kind of shoe, which sells for $50 a pair. If they sold 500,000 pairs of shoes, and had a total cost of $1,000,000, what wa
Think about a recent paper you wrote that required you to narrow your focus on a specific topic. Describe the brainstorming techniques you used to decide your t
What is the opposite of -9? :D
Choose the sentence that is written correctly: Vos chat aiment le poulet. Vos cousins sont drôles. Votre frères sont méchantes. Votre maman sont sympa.
PLEASE HELP ME!! LOTS OF POINTS!! If sine theta equals negative square root of three over two and the range of theta is pi less than theta less than three times
A bag contains 4 red marbles, 7 blue marbles, and 6 green marbles. What is the probability of choosing a blue marble when one marble is drawn?
In an automobile's catalytic converter, several reactions occur to reduce the amount of carbon monoxide, nitrogen monoxide, and unburned hydrocarbon pollutants
Oil with a specific gravity of 0.80 forms a layer 0.90m deep in an open tank that is otherwise filled with water. The total depth of water and oil is 3m. What i
4.15 x 9.23 Please show work
Which is the best strategic therapeutic consideration for children