mparrish2965 mparrish2965
  • 03-07-2022
  • Engineering
contestada

A feature control frame must be connected to

Respuesta :

tcs1257621
tcs1257621 tcs1257621
  • 03-07-2022

Answer:

Surface Parallelism When a surface is to be parallel to a datum plane, the feature control frame is connected by a leader to the surface, or to an extension line from the surface.

Explanation:

Answer Link

Otras preguntas

98 POINTS!!! Based on this passage, how have the interactions between characters changed? Check all that apply.
What system includes the heart?
Sonja's house is 4 blocks west and 1 block south of the center of town. Her school is 3 blocks east and 2 blocks north of the center of town. Which graph repre
Find A U B U C. A){2,3,5,6,7,8,9,11,12}B){2,3,5,6,7,8,9}C){2,3,5,7,8,9,12}D){3,5,6,7,8,11,12}
chapter 9 sections 2 & 3​
FUN POP QUIZ: will make you brainless the first person to answers it. What is Spongbob SquarePants boss at the Krusty Krab
I need help with this one please..​
the declaration of independence explained... problems the colonist had with british rule reasons colonist formed the continental congress why some colonist refu
Help on number 6, please explain
Which of the following options best depicts the flow of information when a gene directs the synthesis of a cellular component? A) RNA → DNA → RNA → protein B) D