In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

If water was a non polar molecule how would the properties of water be different
Explain what options the constitutional convention considered and the reason why
A well-established religious organization in which a substantial number of the population is a member. Answer: Denomination
I think it's either a or c but not sure which
Whar does Power Imply
20% of 140 is what number A)280 B)120 C)28 D)12
In this sentence, identify the tense of the verb in boldface. d Hitchcock will always be the master of suspense.
In a police chase on the interstate, the suspect’s car reached a speed of 88 miles per hour for a total 15 minutes. In that time, how many miles did the chase
Two buses left town A for town B at the same time. The speed of one of the buses was 10 mph greater than the speed of the other bus. In 3 1/2 hours one bus rea
Draw the graph with its equation -2x+7y=14?