emelymartinez emelymartinez
  • 01-03-2017
  • Mathematics
contestada

An experienced carpenter could build a house in 5 days. How much would he have finished if he worked for 3 days?

Respuesta :

MIniNAchoz
MIniNAchoz MIniNAchoz
  • 01-03-2017
I think it would most likely be  3/5
Answer Link
snoopynfriends
snoopynfriends snoopynfriends
  • 01-03-2017
he would have 8 this is the answer
Answer Link

Otras preguntas

Which methods can be used to show that a quadrilateral is a rectangle?\
Declare a vector named sandwichesinstore that stores 3 items of type sandwichingredients.
proper usage of the PRICE method of treatment can heal an ACL injury
Divide and round to the nearest hundredths place. 4.05 ÷ 0.07
Tobacco acts as a stimulant by releasing what into the system
How would you determine which layer is the aqueous layer?
in the system you created in (a), give an example of a sudden change that would affect the stability of the system. Explain what may happen.
Fill in the table with whole numbers to make 34 in four different ways
Most of south america has a population density of __________ people per square kilometer.
is 13.3808315197 a rational number? Need an answer fast!