ellz7oetugaalagirl ellz7oetugaalagirl
  • 02-03-2017
  • Computers and Technology
contestada

To reduce chances of system failure, engineers may use _____ .

Respuesta :

MissPhiladelphia
MissPhiladelphia MissPhiladelphia
  • 15-03-2017
To reduce chances of system failure, engineers may use process control. This is a system which involves activities that ensures the whole process variables can be predicted and controlled to prevent failure. This involves the use of safety valves and sensors.
Answer Link
reyesandrew002 reyesandrew002
  • 13-07-2018

Performance testing // Gradpoint Homies

Answer Link

Otras preguntas

What are other names for convex mirrors?
mathematics help plz
Please answer the question
Which food is not a staple of the Indian diet? rice lentils wheat meat
Please answer the question
What does Jem say caused the events leading up to it (When Jem broke his elbow) In To Kill a Mockingbird?
a right triangle has a hypotenuse that is 40m long and one leg that is 32m long . Find the perimeter of the triangle.​
Which statement would be true from all three of the perspectives you've studied: that of the journalist, of Evalyn McLean, AND of the Hoover administration? A
Read this paragraph. Shadows stretched across the grass as evening approached, and the activity at the park waned. All that remained was a pair of fishermen, ha
What is the value of N in the following equation 2n x 5squared= 25 divided by 32